Mining & Resources

Ogies Project

South Africa

Ogies Project

Bulk earthworks for terraces, dams, access roads & rail line.

Cut to Spoil – 500,000m³, Cut to Fill – 500,000m³. Construction of stacker and reclaimer rail beams. 8536m³ of Concrete, 800 tons Reinforced steel and 31,356 Cast – in Bolts Services including stormwater culverts (1km), concrete lined drains (7.4km), sub soils (4km), HDPE water lines (14.3km) and sleeves (815m).