Construction work involved the following:
Bulk earthworks – Admin building / Workshop Terraces; Plant area and stockpile terraces; Rail Load out; Overland Conveyor formation; Raw water line; High specification Haul Road for Mine Operations; Diversion of the Gravel School Road; Diversion of the surfaced old N4 Provincial Road; Culvert Jacking 3m x 2.5m box culverts under the N4 Highway and Railway line; Various access roads as well as all the internal roads linking the areas above; Firewater, potable water and polluted water reticulation and control dams.