Description

Construction of three cells, completed across three contracts in 2012 and 2013.

Works comprised general earthworks (over 40ha), bulk earthworks (over 1,000,000m3), HDPE liner installation (120,000m2), installation of box culverts and headwalls (250m), overland drainage pumps and piping, emergency flushing water pumps, concrete work, decant tower, decant piping system.

Offices

Level 10
580 St Kilda Rd
Melbourne
VIC 3004
P: 03 9692 7100

Ground Floor
85 McLachlan Ave
Rushcutters Bay
NSW 2011

Level 13
120 Edward St
Brisbane
QLD 4001
P: 07 3073 9093

Level 10
Australia Place
15-17 William St
WA 6000
PO Box Z5192
St Georges Terrace
WA 6831
P: 08 6229 3700
F: 08 6229 3750

45 Hope Valley Rd
Naval Base
WA 6165
PO Box 202
Kwinana WA 6966
P: 08 9410 2100
F: 08 9410 2387

475 Edward Rd
Meru
WA 6530
P: 08 9923 7000
F: 08 9923 7050

17 Cook Street
Busselton
6280